Gold Member Since 2016
Audited Supplier
Changzhou Mingjie Building Material Equipment Manufacturing Co., Ltd.

AAC Fly Ash, Fly Ash Block, AAC Machine manufacturer / supplier in China, offering Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine, Roof AAC Slab Panel Plant Lightweight Wall Panel Machine, External wall panel or Internal wall panel AAC Lightweight Wall Panel Machine and so on.

(/ )

Supplier Homepage Product AAC block machine Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine

Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine

FOB Price: Get Latest Price
Min. Order: 1 Piece
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: mingjie-0007
  • Customized: Customized
  • Type: Welding
  • Origin: China
  • Certification: CE, ISO
  • Automatic Grade: Automatic
  • Trademark: mingjie
Product Description
Lightweight concrete Block AAC Block Machine / AAC Fly ash Block machine
 
 
AAC Block Equipments, Aerated Concrete Block Making Machine 300,000m3/year, 200,000m3/year, 150,000m3/year, 100,000m3/year,etc
 
AAC Block forming process
1 The Preparing of Raw Materials
A) The Preparing of Slurry
B) The Preparing of Lime
C) Cement
D) Stone Powder
E) Waste material
2. Batching, Mixing, Pouring
3. Resting and Pre-curing
4. Demoulding, Cutting, Grouping
5. Curing, Finished Product Leaving Autoclave
6. The Reclaim System of Waste Water & Slurry
 
Planning and Design:

 Factory covers an area of 15000m2 or so. There should be raw material area, finished block area and production area. Production process includes raw material disposal, rated material pouring, curing, cutting and steaming procedure. From building foundation to equipments installing and testing, to trial producing, it will take 4-5 months.  
  
 
Material:

1. Fly ash: get dry ash from power plant
2. Cement: cement in bulk
3. Lime, gypsum and aluminum powder (buy in local area)
 
Water, electricity and steam supply

1. Water supply: build a well or use waste water
2. Electricity supply: install a 315kv transformer
 
 Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine
 
Send your message to this supplier
Avatar
Ms. Yolanda Zhu
Manager
*From:
To: Ms. Yolanda Zhu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now