New Automatic Autoclaved Aerated Concrete Block Machine AAC Block Machine / AAC New Automatic AAC Block Equipments, Aerated Concrete Block Making Machine including400000m3/year,300,000m3/year, 200,000m3/year, 150,000m3/year, 100,000m3/year,etc AAC Block forming process 1 High Automatic of the Preparing of Raw Materials A) The Preparing of Slurry B) The Preparing of Lime C) Cement D) Stone Powder E) Waste material 2. Batching, Mixing, Pouring 3. Resting and Pre-curing 4. Demoulding, Cutting, Grouping 5. Curing, Finished Product Leaving Autoclave 6. The Reclaim System of Waste Water & Slurry Planning and Design: Factory covers an area of 15000m2 or so. There should be raw material area, finished block area and production area. Production process includes raw material disposal, rated material pouring, curing, cutting and steaming procedure. From building foundation to equipments installing and testing, to trial producing, it will take 4-5 months. Material:
1. Fly ash: get dry ash from power plant 2. Cement: cement in bulk 3. Lime, gypsum and aluminum powder (buy in local area) Water, electricity and steam supply 1. Water supply: build a well or use waste water 2. Electricity supply: install a 315kv transformer